Customization: | Available |
---|---|
Theory: | Electromagnetic Relay |
Usage: | Transformer |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Working temperature: -40ºC~120ºC;
Installation method: The axis of the relay pipeline should be parallel to the transformer oil tank cover, and the end leading to the oil storage cabinet is allowed to be slightly higher, but the inclination angle of its axis to the horizontal plane shall not exceed 4%.
Model Series
|
QJ Series
|
Type
|
Double-Float Gas Relay (Buchholz Relay)
|
Application
|
Oil-immersed transformers
|
Operating Temperature Range
|
-40°C to +120°C
|
Installation Angle
|
≤4° relative to horizontal
|
Contact Capacity
|
AC 220V/0.3A, DC 220V/0.3A
|
Power Factor
|
≤0.6
|
Contact Resistance
|
≤5×10-³Ω
|
Insulation Resistance
|
≥100MΩ at 25°C
|
Dielectric Strength
|
≥2kV between contacts and ground
|
Signal Outputs
|
Light gas alarm, heavy gas trip
|
Models
|
QJ20-80, QJ22-80, QJ23-80, QJ31-80, QJ32-80, QJ33-80, QJ43-80
|
Pole Count
|
8, 10, 12
|
Connection Diagrams
|
Diagram 1-7
|
Overall Size
|
Compact design
|
Pipe Diameter
|
Ø80mm
|
Gas Pipe Length
|
9m
|
Parameter | Specification |
---|---|
Model Number | QJ23-80A-8 (Example) |
Float Type | Double float (upper + lower) |
Alarm Trigger | Upper float: Gas accumulation (slow) |
Trip Trigger | Lower float: Oil surge (rapid flow) |
Pipe Diameter | Φ80mm (standard), other sizes optional |
Gas Sampling | Built-in gas vent & sampling box |
Operating Temp. | -40°C to +120°C |
Tilt Angle Limit | ≤4° (for proper installation) |
Enclosure Rating | IP55 (dust/water-resistant) |
Standards | IEC 60076-2, GB/T 7252 |
A:
Upper float: Triggers alarm for slow gas buildup (e.g., partial discharge).
Lower float: Triggers trip for rapid oil flow (e.g., internal short circuit).
A:
QJ23: 23rd design iteration.
80: Pipe diameter (Φ80mm).
A: Dual alarm outputs.
8: 8-meter guide pipe length (with gas sampling box).
A: Yes! It identifies:
Thermal faults (overheating → gas).
Electrical faults (arcing → oil surge).
Insulation degradation (gas composition changes).
A:
Align the relay pipe parallel to the transformer cover.
Tilt slightly (≤4°) toward the conservator.
Ensure gas vent pipes are unobstructed.
A: Recommended! It allows:
On-site gas collection for lab analysis.
Fault type verification (e.g., H2vs. C2H2 ratios).
A:
Annual inspection: Check float movement and contacts.
5-year calibration: Verify gas/oil flow thresholds.